Thursday, October 6, 2016

Dunwoody moving forward with Supplemental Paving List of 15 additional streets.



On September 12th the Dunwoody City Council approved additional Paving Funds for 2016 in order complete the supplemental street paving list.  On the date of the meeting, our City Public Works Director was unsure of the availability of the contracted crews to complete the job but today after being notified by residents that a street on the list was being worked; I reached out and he informed me that he is hopeful that the complete list of streets below will be paved in the next several months.


15 Streets

Brierwood Place from Briers North Drive to End (980 SY), Full Depth Reclamation

Congress Court from Congress Circle to Congress Circle (610 SY), Full Depth Reclamation

Old Springs House Court from Old Spring House Lane to Old Spring House Lane (650 SY), Edge mill and overlay with 9.5 mm Superpave @165 lbs/SY, patching as needed

Georgetown Way from Old Spring House Lane to End (800 SY), Full Depth Reclamation

Norwalk Road from Riverglenn Circle to Riverglenn Circle (1960 SY), Full Depth Reclamation

Kellogg Springs Drive from N Springs Drive to Kellogg Circle (4,170 SY), Edge mill and overlay with Permaflex @ 100 lbs/SY and 9.5 mm Superpave @ 135 lbs/SY, patching as needed

Redbark Place from Redstone Lane to East End (1,310 SY), Edge mill and overlay with 9.5 mm Superpave @165 lbs/SY, patching as needed

Burnham Court from Fontainebleau Drive to South End (1,100 SY), Edge mill and overlay with 9.5 mm Superpave @165 lbs/SY, patching as needed

Old Georgetown Trace from South End to North End (3,910 SY), Edge mill and overlay with Permaflex @ 100 lbs/SY and 9.5 mm Superpave @ 135 lbs/SY, patching as needed

Orleans Way from Chateau Drive to End (550 SY), Full Depth Reclamation

Binghamton Court from South End to Binghamton Drive (860 SY), Edge mill and overlay with 9.5 mm Superpave @165 lbs/SY, patching as needed

Brafferton Way from Tilly Mill Road to West End (1,260 SY), Edge mill and overlay with 9.5 mm Superpave @165 lbs/SY, patching as needed

Madison Place Lane from Binghamton Drive to East End (1,780 SY), Edge mill and overlay with 9.5 mm Superpave @165 lbs/SY, patching as needed

N Springs Court from Kings Down Circle to North End (5,000 SY), Edge mill and overlay with Permaflex @ 100 lbs/SY and 9.5 mm Superpave @ 135 lbs/SY, patching as needed

Stonington Road from Tilly Mill Road to E Kings Point Circle (6,280 SY), Edge mill and overlay with Permaflex @ 100 lbs/SY and 9.5 mm Superpave @ 135 lbs/SY, patching as needed



The following five streets were also under consideration for repaving but I am told there is a chance that DeKalb County will replace the water main under Valley View next year therefore we need to wait and coordinate with them.  The roads in Redfield are unable to be completed by the contractor this year therefore they will be added to the 2017 list and will hopefully be repaved in the Spring.

Valley View Road from Ashford Dunwoody Road to Chamblee Dunwoody Road (10,170 SY), 2” mill and inlay with 9.5 mm Superpave @165 lbs/SY, 4-inch deep patching as needed, striping as directed

Redfield Road from Chamblee Dunwoody Road to End (5,390 SY), Edge mill and overlay with Permaflex @ 100 lbs/SY and 9.5 mm Superpave @ 135 lbs/SY, patching as needed

Redfield Ridge from Redfield Road to End (6,440 SY), Edge mill and overlay with Permaflex @ 100 lbs/SY and 9.5 mm Superpave @ 135 lbs/SY, patching as needed

Redfield Court from Redfield Ridge to Redfield Terrace (3,750 SY), Edge mill and overlay with Permaflex @ 100 lbs/SY and 9.5 mm Superpave @ 135 lbs/SY, patching as needed

Refield Terrace from End to End (4,510 SY), Edge mill and overlay with Permaflex @ 100 lbs/SY and 9.5 mm Superpave @ 135 lbs/SY, patching as needed



In other paving news Chamblee Dunwoody south of Womack is moving slow because water pipes are still being worked but the crews are making progress and we are hopeful that they will be done soon.

No comments:

Post a Comment